
Before

After

About This Project
Full dormer re-side on a two-story New England home. Removed weathered cedar shake, installed HydroGap SA self-adhered drainable weather barrier for moisture protection, replaced windows with proper flashing-tape detailing, and finished with new cedar shake siding. The yellow clapboard on the lower walls was preserved — only the dormer / upper level was replaced, demonstrating Alfa's precision in partial-elevation siding work where blending old and new is critical.
Ready to Start Your Project in Warren?
Contact Alfa Construction Inc today for a free estimate. Licensed & insured with 18+ years of experience serving Massachusetts homeowners.


